Running the forecast…
Running the forecast…
Instrument · Part 61 · started Aug 11, 2026
Built for the student, not for grading the instructor
Demo rates: $165/hr aircraft, $60/hr instructor. Repeat rate 1.31 attempts per passed lesson.
Checked against each aircraft's maintenance schedule
Passed, attempted but not yet passed, and not started
Share of graded attempts below standard (grade 4 or 5)
✓ passed · ↻ attempted, not yet passed · dashed: not started · bold: stage or end-of-course check
Latest training record sheets
GPS approach completed to standard. Good briefing skills.
Work on: ATC communication phraseology; IFR weather minimums
GPS approach completed to standard. Good briefing skills.
Work on: IFR departure procedure review
Unusual attitudes recovery smooth and within tolerances.
Work on: GPS approach briefing flow; IFR departure procedure review
Good scan technique developing. Altitude control within ACS standards.
Work on: Compass turns timing accuracy; Lost comms procedures
Holding entries solid. Good situational awareness on the approach.
Work on: IFR departure procedure review
ILS tracking needs more practice — drifting on glideslope.
Work on: GPS approach briefing flow; Lost comms procedures
Excellent IFR cross country. Good planning and execution.
Work on: Partial panel attitude flying; Alternate airport requirements
ILS tracking needs more practice — drifting on glideslope.
Work on: Approach plate briefing flow